+1.62%

S&O 500 5,382.45

-0.47%

US 10 400

+2.28%

Nasdaq 16,565.41

+2.28%

Crude Oil 16,565.41

-0.27%

FTSE 100 8,144.87

+1.06%

Gold 2,458.10

-0.53%

Euro 1.09

+0.36%

Pound/Dollar 1.27

Friday, July 31, 2026

Commencement of SS-2H ST1 and SS-3H stimulation campaign By Investing.com

by marketdash
0 comments

Highlights

  • Tamboran has commenced stimulation activities of the Shenandoah South 2H sidetrack (SS-2H ST1) and 3H (SS-3H) wells in Beetaloo Basin exploration permit EP 98.
  • The Company is planning to pump up to 119 stimulation stages across the two wells with reduced spacing between stages. The SS-2H ST1 well is planned to include 43 stages over a 5,427-foot (1,654-metre) horizontal section and the SS-3H well is planned to include 76 stages over a 9,766- foot (2,977-metre) horizontal section.
  • The campaign is being conducted with the Liberty Energy (NYSE: LBRT) modern stimulation equipment, which is the first 80,000 hydraulic horsepower (HHP) frac spread imported into the Beetaloo Basin from the US.
  • The increased horsepower from the Liberty equipment is expected to result in a >25% increase in proppant intensity of >2,800 pounds per foot, as compared with Shenandoah South 1H well. All stages are being pumped with a slickwater fluid design.

Read more…

You may also like

Get New Updates nto Take Care Your Pet

Discover the art of creating a joyful and nurturing environment for your beloved pet.

Subscribe my Newsletter for new blog posts, tips & new photos. Let's stay updated!

Will be used in accordance with our Privacy Policy

@ 2024 – Marketdash – All Rights Reserved.